![]() ![]() In the Production Control Shipping Ticket reports, the PlannedShipDate field is now available in the Stimulsoft Reports designer. Previously, exporting purchase orders to Trimble Viewpoint from the Select Requisition/Purchase Order dialog box did not prompt for the company code, sending a blank value to the export report. Previously, in Inventory, when selecting a line item, a Save changes? prompt could appear when no changes were made in the inputs on the previously selected line item. ![]() The drop receives the grade of the chosen material to drop when TFS is performed. ![]() Splice Packages that use material of a variety of grades as sources now receive a grade that is present among the source material. Previously, when combining split tee shapes into full beams, the value grade substitutions were not being considered. In the Remote Monitor settings, the info option has been removed from the Log Level selection. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |